DeterCam Case Study

Stoke Junction Case Study

🇬🇧 United Kingdom Stoke Junction, UK
Target Wildlife:
Deer Deer
Project Overview

Project Overview

The project began in May 2023 as a six-month trial spearheaded by London North Eastern Railway (LNER) and Network Rail, initially utilizing over 250 first-generation DeterCam units to address critical deer incursions.

Following the immediate success of the trial, the programme transitioned to a commercial rollout under Network Rail’s management, expanding across the Stoke Junction operational sector.

Challenge

High deer populations and established crossing paths created severe collision risks, rolling stock damage, and service disruptions, with an historical average of 15 deer strikes per year at Stoke Junction alone. Site inspections revealed frequent deer tracks, droppings, and significant gaps in trackside vegetation and rotted boundary fencing.

Implementing traditional exclusionary fencing presented major financial and logistical hurdles, particularly where boundaries bordered third-party agricultural land. Furthermore, extensive fencing restricted natural wildlife movement and remained vulnerable to ongoing damage, necessitating a reliable, non-lethal automated alternative.

Solution / Deployment

DeterCam units were strategically positioned at identified crossing points, wooded gaps, and open boundaries. The deployment evolved across sequential phases to adapt to environmental demands and operational findings:

• Phase 1 (Stoke Junction Trial):
A 2-mile deployment using 200 devices equipped with solar panels, rechargeable batteries, and Wi-Fi routers. AI algorithms were trained to ignore non-target species (like foxes, badgers, and domestic pets) and strictly target deer.

• Phase 2 (System Enhancement):
Recognizing that UK winter sunlight limited solar efficiency, sensors were upgraded with larger internal batteries and 4G communication modules. Three site visits were conducted to recalibrate camera angles and reinforce damaged fence lines.

• Phase 3:
Installed v2 at Stoke Junction.

• Phase 4:
Installed v3 at Stoke Junction.

• Phase 5:
Install v4 at Stoke Junction

Installed v1 (Phase 1 and Phase 2)
DeterCam v1
DeterCam v1
Installed v2 (Phase 3)
DeterCam v2
DeterCam v2
Installed v3 (Phase 4)
DeterCam v3
DeterCam v3
Installed v4 (Phase 5)
DeterCam v4
DeterCam v4

Installation Layout

Objective

The core objective is to prevent deer–train collisions, minimize associated service delays, and offer a cost-effective, non-lethal infrastructure protection model. Additionally, the system functions as a robust biodiversity monitoring tool, logging species data, habitat usage, and behavioral responses for Network Rail’s environmental tracking.

Key Findings / Observations

• 100% Collision Reduction: Zero deer strikes have been reported within the protected areas during their monitored deployments since May 2023 (down from the baseline of 15 per year).
• High-Volume Deterrence: Over 13,200 This figure till (11th October 2026) deer deterrence events have been recorded across the program to date.
• Immediate Impact: The initial Stoke Junction activation deterred 56 deer on its very first day, clearing animals within four hours of going live.
• Phase Success Rates: The system deterred 680 deer during Phase 1, and over 2,500 deer during Phase 2. At peak crossing zones, deterrence activity frequently exceeded 100 deer in a single day.
• Behavioral Insights: The system tested over 20,000 unique deterrence combinations (visual lights, audible sounds, and ultrasonic frequencies), automatically labeling which alarm profiles were most effective for specific deer species.

Proven Results

DeterCam Milestones

0
Deer Strikes
Deer Deterred
13,200+
Deer Deterred

* Figures from May 2023 to October 11, 2026*

Going Forward

Going Forward

Continuous monitoring will drive further enhancements to AI detection models, deterrence efficacy, and hardware reliability. The extensive data collected will help Network Rail identify emerging wildlife crossing hotspots, proactively guide future installations, and support long-term biodiversity and railway safety objectives.

DeterCam Versions

DeterCam v1
DeterCam v1
DeterCam v2
DeterCam v2
DeterCam v3
DeterCam v3
DeterCam v4
DeterCam v4
DeterCam v5
DeterCam v5

Stoke Junction

(Stoke Junction) 2 miles

Global Deployments

Deployed by Leading Organisations

LNER
Network Rail
Irish Rail
Transport for London
British Transport Police
Hitachi
Department for Transport
KeolisAmey
DLR
SNCF
Ascendi
Etihad Rail
Ready for Deployment

Deploy DeterCam at Your Location

Interested in replicating this case study's success? Get in touch with our engineering team for a customized site survey, wildlife risk assessment, and turn-key installation plan.

Join the Innovation Factory

Book A Discovery Call To Get Started